Now showing items 1-6 of 6

    • Robinson, J.; Bryant, J.; Haberl, J.; Turner, D. (Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1992-05)
      This paper reports on the efforts to calibrate flow sensors that are being used to monitor building thermal energy use in a large scale monitoring project. Several insertion-type paddlewheel meters are being tested with a ...
    • Yagua, C.; Zhou, J.; Wei, G.; Deng, S.; Turner, D.; Parker, J. (Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
      This paper presents a case study of a Continuous Commissioning (CC) project performed at the Austin City Hall. Various CC measures were implemented and significant energy savings were achieved. The paper illustrates a ...
    • Yagua, C.; Wei, G.; Napper, G.; Turner, D.; Effinger, M.; Shahsavary, F. (Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
      This paper presents a case study for the optimization of a multipurpose facility in a school district. The facility is a single-story building with a total conditioned area of 35,571 ft2. It contains a full size basketball ...
    • Wei, G.; Zhou, J.; Turner, D. (Energy Systems Laboratory, 2009-11)
      Continuous Commissioning (CC) is a process that resolves operating problems, optimizes the HVAC system operation and controls to reduce building energy consumption and improve comfort based on current building conditions ...
    • Wei, G.; Zhou, J.; Turner, D.; Lilley, D. (Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
      Continuous Commissioning® (CC®) is a process that resolves operating problems, optimizes the HVAC system operation and controls to reduce building energy consumption and improve comfort based on current building conditions ...
    • Martinez, J.; Linenschmidt, S.; Turner, D. (2004-10)
      A point-to-point verification of the heating, ventilating, and air conditioning (HVAC) system of the Reynolds Army Community Hospital (RACH) in Fort Sill, Oklahoma was done by the Energy Systems Laboratory (ESL) of Texas ...